Vickers House

Vickers House

Delivered for Estuary Housing Association

Project introduction

Lawtech successfully completed the removal and replacement of rainscreen cladding and existing brickwork at Vickers House, Romford.

Vickers (1).JPG
Vickers (1).jpeg (1)
Vickers (2).jpeg
Vickers (3).jpeg

Location

Romford

Value

£8.6 million

Duration

20 months

Completion

January 2023

Scope

Remediation of brickwork and rainscreen

Challenges

Occupied Building

The building is residential and remained occupied throughout the contract. All possible measures were taken to ensure the safety of the residents and to minimise disruption to building occupants, visitors and the general public.

River Rom

This was a challenging project as the block directly overlooks the River Rom, and is located near several local businesses and a busy dual carriageway. The Canal & River Trust were liaised with from the PCSA period to ensure all licences were procured and that they were aware of the works taking place.

Brickwork

The volume of brickwork removal and replacement required was also a substantial challenge and we utilised installers with experience of this workstream specifically to minimise impact.

Vickers (4).jpeg

Solution/Our Approach

Vickers House in Romford provides 93 apartments above two levels of car parking. The building is 10 storeys in height and the top floor level is above 18m from the external ground level.

The works comprised the removal of the existing brickwork and rainscreen cladding, installation of new insulation, fire barriers and sheathing board, and the reinstatement of new brickwork and cladding.

The areas for refurbishment were to all elevations of Vickers House.

"I just wanted to say how pleased I was at having the Cortex removed from my windows and door. The operatives made a great job of cleaning and maintenance of my balcony area. I am so happy to have natural daylight again. Thank you team!"

Resident Feedback

Vickers House

Outcome/Impact

Our team received great feedback from the residents for being helpful, attentive and compassionate as the intrusive works took place, supporting all residents throughout.

Pigeon Netting

Due to the external works pigeon netting had to be removed. Pigeons decided to take this opportunity and start to nest on the resident's balcony. The resident brought this to the attention of the RLO, who contacted the pest control team to humanly remove the pigeons from the balcony and cleaned the area. The resident really appreciated that we cleaned their balcony, whilst relocating the pigeons with their young.

Heatwave Help

During the scorching summer months, the client offered to give a vulnerable resident air con/humidifiers as for safety reasons they could only open their window for ventilation. This was accepted gratefully by the resident and our client had the unit delivered to the site office for us to deliver to the resident. This provided some relief to the resident.

Resident Assistance

A resident came to our site office, requesting for help after a mouse got caught in the trap that she had set the night before. She told us that she could not remove the mouse herself due to her fears. Lawtech stepped in to remove the mouse forthwith. The resident was happy and thanked us for our help.

Vulnerable Resident

One resident had been in hospital to have a major operation. On their return they asked if we could assist in moving their washing machine out from the wall. We stepped in to help resident so that it would make it easier through their recovery. The tenant was extremely grateful for the support.